Environmental integration support for Wamsutter Crude Oil System

About this project

client
Marathon Petroleum Corp.
location
Wyoming, Colorado, and Utah
cost
$158,300
completion date
2018

Helping streamline the environmental aspects of an acquisition

Barr has been providing environmental support to Marathon and companies it has acquired since 2002. In 2018, Andeavor Logistics (now Marathon Petroleum Corp.) purchased the Wamsutter Crude Oil System and asked Barr to help integrate the new assets into Andeavor’s environmental management systems and processes. Barr worked directly on various environmental programs and activities for multiple crude oil storage facilities. Specific tasks included:

  • Performing a regulatory gap assessment

  • Identifying and documenting regulatory applicability

  • Creating a compliance calendar of environmental obligations

  • Integrating assets and data into Andeavor’s environmental management processes and compliance tracking

  • Integrating field personnel and environmental contractors into Andeavor environmental practices and training

  • Supporting day-to-day environmental compliance, contractor management, permitting, and management of change (MOC) reviews

  • Updating plans and supporting permit transfers

  • Completing necessary reporting

  • Conducting environmental inspections as SPCC monthly inspections, while working to train Andeavor staff to eventually take over inspection duties

  • Supporting ongoing correspondence with regulatory agencies and resolution of compliance issues

To help ensure seamless transition and asset integration, we prepared a Compliance Action Plan for each facility, summarizing applicability of environmental programs, identifying and summarizing compliance obligations, and clearly describing responsibilities for environmental, operational, and management staff.

Key team members

Tony Shoberg

Vice President
Senior Chemical Engineer

Tom Holstrom

Senior Environmental Engineer

Related tanks and terminals projects

Stationary-source evaluation for asphalt plants
Spillway upgrades at St. Cloud Dam
Pre-acquisition environmental due diligence review
Testing and optimization of fine-tailings drying technologies
Third-party transmission-line construction monitoring
Siting and permitting for saltwater disposal wells
Engineering design for HDD pipeline replacement under highway
Groundwater monitoring for Fridley Filtration Plant rehabilitation
Engineering services and permitting assistance for Bison 2 and 3 wind farms
Geotechnical, structural, and civil work for Canadian wind farm
Redevelopment services for Surly destination brewery
Groundwater modeling for 1,4-dioxane
First-of-its-kind spent-lime stormwater BMP treatment system
Design services for solar generation facility
Albert Lea Lake outlet modifications
Oxbow-Hickson-Bakke ring-levee flood protection
Engineering services for pipeline reversal
Bathymetry and sediment studies for dredging and restoration of Minnesota lake
Capture-efficiency testing for ethanol production facility
Engineering and design for Universal Studios’ rapids ride
Chemical and biological monitoring of test ponds
Retrofit design for a city-campus parking lot
Greenway design to treat stormwater and mitigate flooding
Inspection, design, and construction oversight for tunnel rehabilitation
Stormwater retrofits along redesigned urban streets
Stormwater treatment wetland for Minnesota college arboretum
Expansion of landfill-gas-fired power generation facility
RICE applicability analysis and audit
Installation of new auxiliary boilers for power plant
Permitting and environmental review for pipeline terminal expansion
Earthen embankments reduce flooding and sediment loading in rural creek
Upgrades and expansion for silica-sand wet plant
Reclamation of legacy tailings site
Engineering services for frac-sand operation
Project prioritization tool for Minnesota watershed district
Flood-control modeling and system upgrades in urban neighborhoods
Sustainable site design for watershed district headquarters
Air-quality permitting and compliance support at pipeline terminals
Environmental permitting and compliance support at terminals
Green infrastructure treats stormwater along light rail corridor
Engineering services for municipal wastewater-treatment facility
Powerhouse and turbine replacement at Redwood Falls
Monitoring of end-pit lake at oil sands mine
Permitting and wetland delineation for a community solar garden
Penstock replacement at McClure Dam
Non-segregating tailings deposition study
Creation of LID master plan for stormwater management
Demonstration rainwater gardens reduce stormwater runoff
Steam-line evaluation at Rapids Energy Center
Air quality permitting for distributed-generation plant
GHG compliance monitoring for oil sands facility
Discovery Point ecological restoration
Air-quality-permitting support for refinery assets
Fish-habitat and floodplain restoration of a Minnesota trout stream
Investigation and design for Freeway Landfill
Stormwater basin retrofits for water quality improvement
Engineering design for crude-oil-terminal pipe rack
Geotechnical deformation and failure modeling of fine tailings capping
Self-contained bog built on college roof
Landslide stabilization and corridor repair for state highway
Engineering design for pipeline pump stations and terminals
Tailings-management area design and construction
Gate automation for the Soo Locks compensating works
Natural channel design for aquatic organism passage
Natural stormwater-treatment system and park redevelopment
Engineering and design for SeaWorld’s Infinity Falls water ride
Sweeney Lake and Schaper Pond water-quality improvement
Upgraded levee system manages flood risk for Minot residents
Hall's Island and Scherer site reconstruction
Structural monitoring of sanitary sewer line
Minnetonka Mills Park design
Flood mitigation at refinery
Engineering services for industrial chemicals mine and processing facility
Trona-mining production optimization
Permitting and compliance services for oilseed-processing plant
Remediation and redevelopment of historic dump
Environmental review for peaking plants
Flood risk reduction for North Dakota city
Engineering and design services for new truck dumper
Response to denatured ethanol release
Stormwater-basin retrofits improve water quality and habitat
Dispersion modeling at five ethanol production facilities
Natural stormwater-treatment system and park redevelopment
Cost analysis for meeting water quality standards
Green infrastructure retrofit of an urban shopping-mall parking lot
Berm-failure study at saltwater disposal well site
Auxiliary boiler installation
Dry Spotted Tail Creek stream restoration
Remediation and residential redevelopment of Whitehall Leather site
Regulatory-compliance assistance for Freeway Landfill
Retrofit engineering for ash conveyance
Hall’s Island redevelopment and restoration
City of New Brighton water treatment plant design
Design and permitting for WISCO Oilfield Special Waste Landfill
Chlor-alkali process design
Support for decommissioning and demolition of manufacturing facility
Option study and design for air jig dewatering system
Permitting, design, and construction oversight for CCR surface impoundment
Brownfields redevelopment for watershed district headquarters
Preliminary design for PFAS-related drinking-water treatment
Renovation of historic Peavey Plaza in downtown Minneapolis
Transmission-line permitting assistance
Environmental permitting and compliance support for a refinery
AFFF containment upgrades evaluation
Air permitting for petroleum refinery’s waxy-crude processing project
Redevelopment of former Mayflower Mine
Expansion-related permitting and review assistance
Installation design for alternative energy facility
Permitting for greenfield renewable diesel production facility in Utah
Permitting for the conversion of a petroleum refinery to renewable diesel production
Preclassification system feasibility study, design, and construction support
Geotechnical investigation for the East Valley Battery Storage Facility
Civil engineering services for 10 MW solar facility
Environmental services for cathodic protection facilities in Michigan
Structural analysis and evaluation of powerhouse
Transaction due diligence for oil and gas assets
Creating ESG clarity for a petroleum company
Above-ground tailings management and mine backfill
ESG policy review and advisory services
ESG framework for midstream oil and gas company
Crane walk geotechnical engineering at Kings Point wind site
Rushford levee system remediation
Cyclic degradation geotechnical evaluation for wind turbine foundations
Business risk assessment of species at risk in oil sands region
Aggregate resource estimate along proposed pipeline routes
Field review and permitting for pipeline replacement
Environmental field review and MPSC Act 9 support
PFAS-impacted drinking water response and treatment plant design
Hydrogen generator process skid design
Gas processing equipment, outage procedure and fitness-for-service evaluation
Design of gas storage well pipelines and well pads
Pipeline and facility outage procedure
Pressure control valve methanol-injection engineering study
Cathodic protection design for pipeline projects
CFD modeling for spillway replacement
Engineering services for solution mine
Geotechnical engineering and environmental services for oil refinery solar farm
Process and plant design for potash mine
Park and trail conceptual design for the city of Biwabik
Water reuse system design
NEPA support for coal mine expansion
Environmental permitting and engineering design for biomass carbon production
Permitting and field review for natural gas pipeline replacement
Wind farm repowering structural assessment
Purgatory Park restoration master plan
Pipeline route permitting assistance
Reasonably available control technology analysis for refinery
Engineering services for industrial landfill expansion and closure
Air permitting for refinery conversion from petroleum to renewables