Upper Sheyenne River erosion and sedimentation risk assessment

About this project

client
Upper Sheyenne River Joint Water Resource Board
location
North Dakota
cost
$112,000
completion date
2019

The Upper Sheyenne River is a 300-mile segment of the Sheyenne River in north-central North Dakota, flowing through nine counties that together make up the Upper Sheyenne River Joint Water Resource Board (Joint Board). In recent years the river has experienced significant bank erosion and channel migration, threatening local infrastructure in several locations. The Joint Board hired Barr to conduct an erosion and sedimentation risk assessment of the entire Upper Sheyenne River riparian corridor, from the headwaters to Baldhill Dam. The results of the risk assessment will be used to prioritize restoration activities along the river and to guide applications for project funding from federal and state grant programs.

 

Our work included background data collection and public meetings to identify key areas of concern, field surveys at 15 locations along the river to characterize typical channel dimensions and evaluate bank stability, and analysis and risk assessment. The risk assessment used the Rapid Resource Inventory for Sediment and Stability Consequences (RRISSC), a component of the Watershed Assessment of River Stability and Sediment Supply (WARSSS) methodology (Rosgen, 2009).

 

The risk assessment found that 18 of the 30 river reaches in the study area are at high risk for ongoing channel instability. Barr prepared concept stabilization recommendations for several of the study locations.

Key team members

Jason Westbrock

Vice President
Civil Engineer

Miguel Wong

Senior Civil Engineer

Peter Hinck

Senior Water Resources Engineer

Mandar Nangare

Water Resources Engineer

Wyatt Mack

Environmental Scientist

Related Stream, river, and lake projects

Landfill-gas monitoring at remediated dump to support brownfield redevelopment
Stationary-source evaluation for asphalt plants
Spillway upgrades at St. Cloud Dam
Landscape master plan for watershed district
Park and landscape design for Mouse River enhanced flood protection project
O&M manual for green-infrastructure stormwater BMPs
Design and prioritization of spillway gate repairs
Phase I ESA for copper-nickel project
Coffee Creek trout stream restoration
Alternatives evaluation for repairs or replacement to Odland Dam and spillway
Siting and permitting for saltwater disposal wells
Ore transportation study
Detailed assessment of phosphorus sources and loading to Minnesota watersheds
Permitting, environmental assessment, and design for copper-nickel mine
Groundwater monitoring for Fridley Filtration Plant rehabilitation
Incident energy and arc flash hazard analyses of three facilities
Natural-resources management plan for suburban park
Routine electrical, controls, and instrumentation support
Feasibility design and inspections of an urban stormwater-management tunnel
Snowpack monitoring and lake drawdown for Minnesota watershed district
Preliminary engineering for Mouse River enhanced flood protection project
Geotechnical investigation and design for expansion of ancient gold mine
Groundwater modeling for 1,4-dioxane
First-of-its-kind spent-lime stormwater BMP treatment system
Electric-energy resource options study
Environmental impact assessment for mountain-bike trail
Albert Lea Lake outlet modifications
Penn Avenue sinkhole investigation and rehabilitation
Scoping study to increase magnetite-concentrate production capacity
Oxbow-Hickson-Bakke ring-levee flood protection
Development of sewer plan and update of model
Bathymetry and sediment studies for dredging and restoration of Minnesota lake
Water supply sustainability study for City of Rochester
Mon-Maq Dam removal assessment and process design
Capture efficiency testing for ethanol production facility
Study of engineering risks and site feasibility for windpower client
Chemical and biological monitoring of test ponds
Natural resources inventory and stewardship recommendations
Water-quality modeling and mapping for watershed district
Infiltration updates to the Minnesota Stormwater Manual
Stormwater storage facility for major Minneapolis interstate artery
Geologic modeling and mine-plan development for aggregate quarries
Resource estimates for neodymium-rich rare-earth-element exploration project
Retrofit design for a city-campus parking lot
Water-quality and sediment-dredging study to restore a phosphorus-impaired lake
Advanced oxidation process pilot evaluation for municipal drinking-water system
Rapid response planning for aquatic invasive species
Greenway design to treat stormwater and mitigate flooding
Environmental review for proposed natural-gas pipeline
Inspection, design, and construction oversight for tunnel rehabilitation
Stormwater retrofits along redesigned urban streets
Assessment and remediation of former dump site on university campus
Sustainable landscape master plan for Minnesota college campus
Inspection and repair of urban stormwater tunnels
Updating of Lake Superior chemical source inventory
Earthen embankments reduce flooding and sediment loading in rural creek
Upgrade of wastewater treatment system
Environmental liability assessment at manufacturing facility
Bridge movement monitoring
Environmental review and prefeasibility design for planned uranium mine
Project prioritization tool for Minnesota watershed district
Natural resources master plan
Embankment stabilization along Highway 73
Vulnerability assessment of municipal stormwater system
Vulnerability assessment of a city’s aging storm sewer system
Test burn for cofiring coal and biomass
Transmission-line EIS
Flood-control modeling and system upgrades in urban neighborhoods
Groundwater modeling for wellhead-protection-plan amendment
Sediment removal from beneath Vermillion River bridge
Flood forecast mapping for city's emergency response and planning efforts
Sustainable site design for watershed district headquarters
Living-streets planning provides framework for alternative street reconstruction
Improvements to municipal flood-risk-protection system
Green infrastructure treats stormwater along light rail corridor
Engineering services for municipal wastewater-treatment facility
Groundwater-surface water study of McKenna Lake
West Side Flats park and stormwater design
Powerhouse and turbine replacement at Redwood Falls
Highway 55 storm-tunnel inspection
Stormwater management system for Minnesota district
Non-segregating tailings deposition study
Creation of LID master plan for stormwater management
Modeling and failure risk assessment of a municipal storm sewer system
XP-SWMM model update and calibration for Minnesota watershed
Demonstration rainwater gardens reduce stormwater runoff
Flood risk reduction of suburban lakes
Letter of map revision for Minnesota city
Infrastructure inspection program for Minnesota watershed district
Air permit-to-install strategy and application
Discovery Point ecological restoration
Hiawatha Golf Course alternatives analysis and master planning
Identification of wetland restoration opportunities
Investigation and design for Freeway Landfill
Stormwater basin retrofits for water quality improvement
Watershed management planning for Minnesota watershed district
Site reviews for solar gardens across Minnesota
Whitewater State Park stream restoration
Hennepin County sustainable landscape guidelines
Removing dissolved metals from roadway runoff using ferric-oxide filtration
Geotechnical deformation and failure modeling of fine tailings capping
Stormwater-management minimal impact design standards and BMP design calculator
West River Parkway landslide repair
Hydropower facility evaluation and due diligence
Landslide stabilization and corridor repair for state highway
Public-space and sustainable stormwater management decision-making framework
FERC relicensing of Ford Lake Dam
Gate automation for the Soo Locks compensating works
Water quality and ecological improvements to an urban lake
Stormwater-development reviews for urban WMO
Hydrologic study of North Dakota lake
Design, review, and permitting of mountain bike park
Hydrology and hydraulic modeling of a tunnel system
Environmental site assessments for future site of mining and processing facility
Condition assessment and options study for hydro facility
Sweeney Lake and Schaper Pond water-quality improvement
One Watershed, One Plan development for southern Minnesota watershed district
Vapor-mitigation implementation and maintenance at business center
Upgraded levee system manages flood risk for Minot residents
Third-party EIS review of transmission line
Hall's Island and Scherer site reconstruction
Minnehaha Park lower glen restoration
Resource assessment and permitting assistance for industrial sands facility
Minnetonka Mills Park design
Wetland replacement assistance for highway project
Design of an LED lighting system for a downtown streetscape
Groundwater-flow model of the Twin Cities metro area
Fast-track realignment of a storm sewer
Remediation and redevelopment of historic dump
Geotechnical assistance for mine expansion at Julienne Lake
Development of a citywide GIS-based stormwater management water-quality model
Lilydale Regional Park stormwater management and slope stabilization
PFOS investigation at municipal wastewater plant
Municipal drinking-water wellhouse evaluation and design
Flood risk reduction for North Dakota city
Shoreline stabilization and restoration of Lake Minnetonka’s Big Island
Landscape master plan for Minnesota college campus
Stormwater infrastructure management assistance
Restoration of trout habitat in Vermilion River
Compliance, resource, and process evaluations for potential mining sites
Aquatic invasive species (AIS) management in a Wisconsin lake
Stormwater-basin retrofits improve water quality and habitat
Dispersion modeling at five ethanol production facilities
Evaluating tunnel system pressure
Natural stormwater-treatment system and park redevelopment
Cost analysis for meeting water quality standards
Green infrastructure retrofit of an urban shopping-mall parking lot
Dry Spotted Tail Creek stream restoration
Preliminary feasibility study for PFAS-related water quality concerns
Stormwater-development reviews for an urban watershed district
Urban watershed stormwater-development and permit reviews
Remediation and residential redevelopment of Whitehall Leather site
Rockford dam removal
Regulatory-compliance assistance for Freeway Landfill
Ecological residential development design preserves nature and city growth
Groundwater modeling and remedial improvements at closed landfills
Hall’s Island redevelopment and restoration
City of New Brighton water treatment plant design
Redevelopment services for New Brighton Exchange
Stressor-identification report for an impaired urban stream
Energy integration study for waste-heat utilization
Strategic planning for Freeway Landfill
Environmental services for coal-yard decommissioning
Brownfields redevelopment for Mississippi WMO headquarters
Post-flood stream assessment and natural channel design
Redevelopment assistance for Clyde Iron Works site
Tongue River assessment
Brownfields redevelopment for watershed district headquarters
Preliminary design for PFAS-related drinking-water treatment
Groundwater modeling for water-supply wellfield expansion
Renovation of historic Peavey Plaza in downtown Minneapolis
Environmental permitting and compliance support for a refinery
AFFF containment upgrades evaluation