Berm-failure study at saltwater disposal well site

About this project

client
Confidential
location
North Dakota
cost
$23,000 (Barr's fees)
completion date
2018

In the event of a theoretical failure of the secondary containment system at a salt water disposal well site, Barr was hired to evaluate how much land would be impacted and the timing of contamination. We also evaluated measures that could be put into place to prevent contamination from reaching the Missouri River in the event of a failure.

Barr created a time-lapse GIS animation showing the spread of the plume under various conditions (see below for a video clip of this animation).

Key team members

Jason Westbrock

Vice President
Civil Engineer

Cory Anderson

Water Resources Engineer

Related exploration and production projects

Stationary-source evaluation for asphalt plants
Pre-acquisition environmental due diligence review
Testing and optimization of fine-tailings drying technologies
Park and landscape design for Mouse River enhanced flood protection project
Design of abutment wall extension at Dells hydro station
Coffee Creek trout stream restoration
Siting and permitting for saltwater disposal wells
Dry-stack tailings management
Engineering design for HDD pipeline replacement under highway
Tailings basin expansion and closure options
Investigation and remediation of jet-fuel release
Vapor intrusion investigation and mitigation in a residential neighborhood
Snowpack monitoring and lake drawdown for Minnesota watershed district
Penn Avenue sinkhole investigation and rehabilitation
UMore Park environmental services
Engineering services for pipeline reversal
Environmental integration support for Wamsutter Crude Oil System
Capture efficiency testing for ethanol production facility
Chemical and biological monitoring of test ponds
Landslide stabilization design for an underground coal mine
Advanced oxidation process pilot evaluation for municipal drinking-water system
Expansion of landfill-gas-fired power generation facility
Reciprocating internal combustion engine (RICE) applicability analysis and audit
Permitting and environmental review for pipeline terminal expansion
Responding to wind-farm tornado damage
Evaluation of wind-turbine foundation following fire damage
Groundwater modeling for wellhead-protection-plan amendment
Multi-site PFAS remedial investigation and remediation
Sediment removal from beneath Vermillion River bridge
Air-quality permitting and compliance support at pipeline terminals
Environmental permitting and compliance support at terminals
Monitoring of end-pit lake at oil sands mine
Non-segregating tailings deposition study
Flood risk reduction of suburban lakes
Letter of map revision for Minnesota city
Options study and design to restore biomass fuel-handling system
Mine remediation and reclamation
GHG compliance monitoring for oil sands facility
Air-quality-permitting support for refinery assets
Permitting assistance and fen management plan
Engineering design for crude-oil-terminal pipe rack
Geotechnical deformation and failure modeling of fine tailings capping
West River Parkway landslide repair
Engineering design for pipeline pump stations and terminals
FERC relicensing of Ford Lake Dam
Groundwater compliance assistance for CCR Rule
Hydrologic study of North Dakota lake
Floodproofing of utility switchyard
Flood mitigation at refinery
Wetland replacement assistance for highway project
Environmental support for post-fire cleanup at industrial facility
Lilydale Regional Park stormwater management and slope stabilization
PFOS investigation at municipal wastewater plant
Response to denatured ethanol release
Aquatic invasive species (AIS) management in a Wisconsin lake
Dispersion modeling at five ethanol production facilities
Solar-energy-system compliance
Preliminary feasibility study for PFAS-related water quality concerns
Rockford dam removal
Groundwater modeling and remedial improvements at closed landfills
Design and permitting for WISCO Oilfield Special Waste Landfill
Stressor-identification report for an impaired urban stream
Post-flood stream assessment and natural channel design
Chlor-alkali process design
Environmental permitting and compliance support for a refinery
AFFF containment upgrades evaluation
Air permitting for petroleum refinery’s waxy-crude processing project