Hydrology and hydraulic modeling of a tunnel system

About this project

Client
City of Minneapolis
Location
Minnesota
Cost
$110,000 (Barr's fees)
Completion date
2015

Drainage systems in downtown Minneapolis were experiencing capacity problems, so the City of Minneapolis hired Barr to develop an XP-SWMM model of the Central City, Chicago Avenue, and 11th Avenue drainage systems and perform a feasibility study of the Central City tunnel system.

First, Barr developed a detailed model of each of the tunnel systems. Then, the model of the Central City tunnel system was used to conduct a feasibility study to investigate its hydraulic capacity and identify alternatives to mitigate its existing capacity problems. We provided the city with a recommended alternative for addressing the existing capacity issues. The City completed construction of the project in 2024.