A Tesla Megapack being expertly suspended mid-air during the lifting process by Winslow Crane. Notably, two taglines were employed to ensure controlled and safe handling during this operation. A Tesla Megapack is suspended in mid-air during lifting. Two tag lines enabled controlled and safe handling of each 80,000‑pound‑plus battery.

Utility-scale BESS engineering and design

From feasibility assessments through construction, Barr helped Ameresco site, plan, permit, design, and integrate eight BESS for United Power’s electrical distribution system in Colorado’s north-central Front Range.

Read more about this utility‑scale battery storage project.