Barr’s Michigan team has been assisting clients with ecological assessments and environmental permitting for decades. With the summer field season in progress, our environmental professionals are busy conducting vegetation and wildlife surveys. Senior environmental scientist John Vigna from our Grand Rapids office shares some insight into the process.
A: We perform vegetation and wildlife assessments for clients across a variety of industries and for a variety of purposes. For example, mine expansion projects may require some level of overall vegetation assessment and a threatened and endangered (T&E) evaluation during the permitting phase. County road or trail projects that use federal funding are required to perform an environmental review, which includes federal and state (T&E) species habitat assessments. We work with large energy companies to complete invasive plant species or T&E species reviews to fulfill federal licensing or permitting requirements. During water resource permitting in Michigan, if the Michigan Department of Environment, Great Lakes, and Energy identifies an impact to a known rare species on or near a particular project site, clients will often bring us in to evaluate the presence of that species and its potential habitat. We’ve also conducted mussel surveys during dredging projects and marina construction permitting.
A: Although some project plans may have to be altered or totally shuttered due to T&E species being identified on a property, a large number of projects may be able to obtain an endangered species permit to authorize the taking of a particular species in order to develop a site. Best management practices to avoid and minimize impacts and relocation of the species along with some level of follow-up monitoring are typically required.
A: When walking a site with our botanist, Bill Brodovich, I identified the uncommon blue-flowered form of the normally brick-colored scarlet pimpernel (Anagallis arvensis). It is a common (though attractive) weed of farm fields.
A: When tree removals occur on a project site, Indiana bat and northern long-eared bat habitat evaluations may be required, and tree removal is prohibited during certain times of the year.
John Vigna has 27 years of experience in the fields of environmental compliance and natural resource management, and permitting. His work involves a wide variety of natural resource permitting projects, habitat evaluations, wetland delineations, wetland mitigation monitoring, and Phase I environmental site assessments.
Facing climate-change challenges with confidence
TRI updates include new reporting requirements
Q&A: Survey season in Michigan
Are trolley-assist haul trucks the next advancement for Minnesota mines?
Barr names Ward Swanson as president and CEO
Receive the latest editions right to your inbox and explore industry trends, projects, and company news.
Restoring impaired lakes through adaptive management
New EPA standards for oil and natural gas storage tank venting systems
New wastewater discharge standards for coal-fired power plants
Hometown flooding experience inspires career aspirations
Choose your own adventure as an intern at Barr
Internship offers real-life experience in the Canadian oil sands
EPA finalizes GHG standards for electric power generation industry
Improving the ecological health of natural areas within your park system
From teenage errand boy to chief marketing officer
Ready or not, artificial intelligence is here to stay
Certain PFAS now designated as hazardous substances under CERCLA
EPA releases maximum contaminant levels for PFAS in drinking water
Envisioning reuse: The next chapter in the story of industrial water
Hear more about water reuse from Barr's experts
Project: Turning a facility’s wastewater into process water
Project: System evaluation to achieve zero liquid discharge
Navigating the storm: Effectively managing industrial stormwater
Seeing the picture below ground
New PFAS reporting requirements under TSCA
Engineer makes a career, and a hobby, out of modeling
Addressing water scarcity: A case study on aquifer storage and recovery projects
Stack test method OTM-50 announced to measure PFAS in air emissions
Q&A: From operations-based site experience to practical geotechnical mining solutions
Revolutionizing tomorrow through technology and innovation
Cost of removal and destruction of PFAS from wastewater effluent
4,000 wetlands and counting: Journeys of a wetland ecologist
Managing risks when decommissioning PFAS-impacted facilities
Developing a sustainable mine closure vision
Ecosphere Environmental Services, Inc. staff join Barr
A zoo with a view: Treetop Trail opens
Clean water for the Yanesha people of Peru
Adding RNG to your energy portfolio
Happy holidays from all of us at Barr!
Watershed-wide analysis improves strategies to manage climate change
An ecosystem approach to watershed planning and water resource protection
Stormwater O&M: When construction ends, the work begins
How will changes to the TRI/PFAS reporting rule affect your facility?
Barr brings a straightforward approach to Minnesota PFAS cost estimate study
Diving into the data as an air quality specialist
How safe is your tailings dam?
New technology expands access to solar energy
Slope repair puts solid ground under the skis
Creative solutions result in time and cost savings for clients
University flips the switch to “dark-sky-friendly" lighting plan
EPA program connects partners for sediment restoration
MSHA proposes new silica-exposure standards
The evolution of PFAS analytical methods over the last decade
Mining the Intermountain West: From operations to consulting
Six reasons to add RNG to your energy portfolio
Balancing power generation with air quality compliance
Wind turbine foundations now and in the future
Summarizing recent changes to NEPA
Making the most of every opportunity
Gaining real-world experience through Barr’s internship program
From a client’s perspective
Using waste heat recovery for carbon management
Minnesota's mine-reclamation legacy enters exciting new chapter
Building climate resilience through green infrastructure design
Navigating CCR compliance under recent EPA determinations
Municipal waste stream PFAS removal and destruction: Current alternatives and cost
EPA proposes rule to reduce ethylene oxide emissions from commercial sterilizers
Barr celebrates Founders Day: A CEO’s perspective
Five steps to develop a greenhouse gas inventory for agricultural manufacturing
How will the new PFAS MCLs affect NPDES permits?
Time to repower your wind energy site?
Foundation assessment a critical first step for wind repowering
New heat-sensing drone sees the unseen
Natural resources plan addresses city’s changing ecosystem
To heal nutrient-impaired lakes, apply persistence and resourcefulness
EPA proposes maximum contaminant levels for six PFAS
Two projects honored for engineering excellence
Adding lithium to mining operations: Environmental, permitting, and ESG factors
Adding lithium to mining operations: Engineering and design factors
Collecting data from the skies with reality capture technology
Green infrastructure and stacked-benefits projects
EPA proposes maximum contaminant levels for six PFAS in drinking water
Minnesota DNR releases new commercial solar siting guidance
Emerging PFAS destruction technologies
The Inflation Reduction Act: Manufacturing focus
Domestic uranium production on the rise
EPA's latest proposed rule eliminates PFAS reporting exemption
Introducing Barr’s ugly holiday sweater contest winner
Civil designs create homes for the holidays
Designing Africa's first potash processing facility
Q&A: Are mussels impeding your underwater project?
EPA begins enforcement of coal-ash disposal rule
Floodplain management expert joins Barr
From our CEO
Designing Africa’s first potash mine
The Inflation Reduction Act: Mining focus
The Inflation Reduction Act: Power focus
A deeper look into the promising new PFAS destruction approach
Tailings storage facilities: A unique challenge for a critical industry
The Inflation Reduction Act: Fuels focus
Making an impact in the Rocky Mountain Region
From Boy Scout to Senior NEPA Consultant
Stabilizing a community's backup water supply
Q&A: In your ESG journey, keep the destination in mind
Inflation Reduction Act opens door for energy investment
Reviving landings on Lake Michigan's Plum and Pilot Islands